MENU

Construction Method of Waterproof Rigid Core Vinyl Flooring

03/09/2020

Construction method of waterproof rigid core vinyl flooring:

waterproof rigid core vinyl flooring

1. Plain ground treatment: according to the condition of plain ground, polish, repair and remove dust;

2. Vinyl ester primer: the vinyl ester resin is added with accelerator and curing agent according to the appropriate proportion, and the plain ground is scraped once to enhance the surface adhesion;

3. Laying glass fabric: place the glass fabric flat, adhere the glass fabric with the prepared vinyl ester intermediate coating, and level the vinyl ester intermediate coating with a cutter to make it evenly coated, and make one to three layers as required;

4. Vinyl ester intermediate coating: evenly coat the prepared vinyl ester intermediate paint with a trowel for one to two times;

5. Vinyl ester topcoat: the prepared vinyl ester topcoat is evenly coated with a trowel, and the whole ground is bright and clean after completion, with uniform color and no hollowing;

6. Completion of Construction: people can be boarded after 24 hours, and heavy pressure can be carried out after 72 hours. (subject to 25 ℃, the opening time at low temperature should be appropriately extended)

7. Maintenance of waterproof rigid core vinyl flooring

OTHER NEWS

INQUIRY

Name is required!

Mail address required!

Mail address must be valid!

Click it

Message field is empty!

Back to Top